CPM Construction Managment: Scheduling By the Critical Path Method
by James J. O'brien
- Used
- very good
- Condition
- Very Good/Good
- Seller
-
Newtown, New South Wales, Australia
Payment Methods Accepted
About This Item
New York, U.S.A.: McGraw-Hill , 1965 The dust jacket has a bit of wear, with foxing, scuffs on the edges and a tear on the bottom spine. The page edges are lightly foxed and tanned, as are the inside covers. 254 pages. Books listed here are not stored at the shop. Please contact us if you want to pick up a book from Newtown.. Hardcover. Very Good/Good.
Reviews
(Log in or Create an Account first!)
Details
- Bookseller
- Goulds Book Arcade (AU)
- Bookseller's Inventory #
- 166434
- Title
- CPM Construction Managment: Scheduling By the Critical Path Method
- Author
- James J. O'brien
- Format/Binding
- Book Condition
- Used - Very Good
- Jacket Condition
- Good
- Publisher
- McGraw-Hill
- Place of Publication
- New York, U.S.A.
- Date Published
- 1965
- Keywords
- [586G CONSTRUCTION MANAGEMENT BUILDING NOEBAY
Terms of Sale
Goulds Book Arcade
30 day return guarantee, with full refund including original shipping costs for up to 30 days after delivery if an item arrives misdescribed or damaged.
About the Seller
Goulds Book Arcade
Biblio member since 2013
Newtown, New South Wales
About Goulds Book Arcade
A local, family-run bookshop, Goulds is a member of the Australian Booksellers Association (ABA).
Since 1989 Goulds Book Arcade was at the city end of King St, Newtown, but moved in late 2018.
The shop is now located at 536 King St.
That's directly opposite Alice St in south Newtown, near the New Theatre.
If you want to pick up ordered items from the shop please contact us first as the listed items are not stored at the shop.
Since 1989 Goulds Book Arcade was at the city end of King St, Newtown, but moved in late 2018.
The shop is now located at 536 King St.
That's directly opposite Alice St in south Newtown, near the New Theatre.
If you want to pick up ordered items from the shop please contact us first as the listed items are not stored at the shop.
Glossary
Some terminology that may be used in this description includes:
- Foxed
- Foxing is the age related browning, or brown-yellowish spots, that can occur to book paper over time. When this aging process...
- Jacket
- Sometimes used as another term for dust jacket, a protective and often decorative wrapper, usually made of paper which wraps...
- Spine
- The outer portion of a book which covers the actual binding. The spine usually faces outward when a book is placed on a shelf....
- Edges
- The collective of the top, fore and bottom edges of the text block of the book, being that part of the edges of the pages of a...